Six months of work!

We’ve been very busy on the new house, with lots of updates for you. Underground drains and the storm drain were installed, and soon after came the garage footing insulation. From there, we proceeded with framing, waterproofing the outside walls, basement utility connections and floor prep, all the heating, plumbing and electrical rough-ins, as well as the spray foam insulation. It’s really coming together quickly!

draingaragefootingframing4framing3framing2framingwaterproofingconnectionsfoorprepbasementfloorroughins3roughins2roughinsfoamsprayfoam

Stay tuned! We’ll post more photos soon.

This entry was posted in Progress. Bookmark the permalink.